Stockport Mill Lift Repair
    Back to Portfolio
    Mechanical Repair

    Stockport Mill Lift Repair

    Project Overview

    Attended site to re-line brakes at a mill in Stockport. Upon inspection, the original brake drum was found to be cracked. With a 4-week lead time for a replacement from the OEM, our precision engineering team manufactured a custom replacement drum in-house. It was installed alongside the newly re-lined brake arms, getting the lift back in service without the extensive wait.

    Need similar support?

    Contact our trade engineering team today for a quote.

    Request a Quote

    Message Us

    Fill out the form below and our team will get back to you shortly.

    QuoteCall